
Digital Edge AESPA
ATPD provided design management services for a 391,000 SF, 120 MW, greenfield, multi-story data center. Led c…
Digital Edge NARRA1
ATPD provided design management & construction management services for a 157,046 SF (14,590 m2), 10 MW, green...
Confidential Data Center Client
Mission Critical
AT-PD provided design management services for a 1,000,000 SF, 60 MW, greenfield, single-story data center in New Mexico. The project includes indirect evaporative cooling, block redundant electrical topology, and all supporting infrastructure.
Digital Edge EDGE2
ATPD provided design management & construction management services for a 408,361 SF (37,938 m2), 30 MW, green...
Cyxtera SFO4B
Mission Critical
AT-PD provided full project management services for an 80,000 SF, 6 MW, existing, multi-story data center. Led client through cold shell fit-out of dedicated buildout in Santa Clara, CA. The project included advanced cooling and electrical topologies with supporting infrastructure.
Confidential Colocation Client
Mission Critical
AT-PD provided full project management services for a new 19,000 SF, 27 MVA substation to support a new data center colocation facility. Led client through planning, environmental/CEQA, permitting, and tendering in Santa Clara, CA. The project includes design, oversight, and support of new control building, infrastructure, transmission line tie into the city grid, and rollover of the live environment to the new source.
Adobe DH4
Mission Critical
AT-PD provided full project management services for a 40,000 SF, 4.0 MW, greenfield, single-story expansion to the existing data center. Led client through planning, environmental, permitting, and tendering in Hillsboro, OR. The project includes Tier III block redundant electrical and indirect evaporative cooling mechanical infrastructure.
VMWare PODS 1-3
Mission Critical
AT-PD provided turnkey services for data hall upgrades for a 25,000 SF, 7.2MW, single-story, brownfield data center. Led client preconstruction through Commissioning and handoff in Wenatchee, WA. The project includes tenant improvement, the addition of UPS, and a standby generator to achieve new Tier III reliability with power densities up to 21KW per rack.
Equinix
Mission Critical
AT-PD provided full project management services for over 1.1M SF of neutral colocation data center space. Led clients through all aspects of site assessment, acquisition, planning, environmental, permitting, and tendering in multiple locations. Projects include multi-generator, multi-hall centers in urban and suburban US sites.
Adobe DH1-3
Mission Critical
AT-PD provided full project management services for a 40,000 SF, 4.0 MW, greenfield, single-story expansion to the existing data center. Led client through planning, environmental, permitting, and tendering in Hillsboro, OR. The project includes Tier III block redundant electrical and indirect evaporative cooling mechanical infrastructure.
Confidential Colocation Client
Mission Critical
AT-PD provided full project management services for a 159,000 SF, 16 MW, greenfield, multi-story data center. Led client through planning, environmental/CEQA, permitting, and tendering in Santa Clara, CA. The project includes the first fully base isolated viscous dampened colocation data center in a tight urban build in Silicon Valley.
Confidential Colocation Client
Mission Critical
AT-PD provided project and construction management services for over 435,000 SF, hyperscale, neutral colocations data centers. Led clients through master planning, product development, and analysis in multiple locations. Projects included two multi-story, 217,000 SF data centers, a new substation, and three 50MW transformers.
Cyxtera TP1
Mission Critical
AT-PD provided design administration services for capital improvements and upgrades on a 33,000 SF, existing colocation data center. Led client through the full mechanical system replacement in a live, mission-critical environment in Tampa, FL. The project included the changeout of four air-cooled chillers with new startup, recertification, and commissioning without any loss of redundancy or downtime.